Construction of El-Sadat Axis Bridge (Street 45)

The construction of the El-Sadat Axis Bridge is part of the government’s plan to upgrade key traffic corridors in East Alexandria, aiming to reduce congestion at vital intersections. TESECO participated as the engineering consultant in this transformational project, which enhances mobility within the city and improves connectivity with national road networks.


🔹Project Scope

. Total bridge length: Approximately 2.6 kilometers

. Traffic capacity: 3 lanes in each direction

. Lower level traffic structure: Connects El-Sadat Street (Street 45) with the International Coastal Road

. Upper level traffic structure: Connects the International Coastal Road with El-Sadat Street, with integration toward El-Saa’a Square


🎯 Strategy Objectives

Resolving traffic congestion

Resolve traffic congestion at the intersection of Mostafa Kamel Street and El-Sadat Street.

Conneciing corniche and the international coastal road

Provide a direct and smooth link between the Corniche and the International Coastal Road, passing through El-Saa’a Square and Al-Maamoura.

Support integration between key road networks

Corniche – Mostafa Kamel – Al-Mahmoudiyah Axis – Agricultural Road – International Coastal Road.


Project Signature

. The bridge is a cornerstone project in the development of East Alexandria, improving transportation efficiency in a high-density urban area.

. It reflects a shift toward sustainable traffic solutions that accommodate urban expansion and increasing vehicle numbers.


Participating Entities

Alexandria Governorate

Alexandria Governorate

Central Agency For Reconstruction

Central Agency For Reconstruction

Faculty of Engineering

Faculty of Engineering

Teseco EG

Teseco EG

The Engineering Authority of the Armed Forces

The Engineering Authority of the Armed Forces

United Company For Construction

United Company For Construction

  • Category Infra-structure
  • Time Line July 2023 Till current